Installation – CHIEF AN1 Series User Manual

Page 6

Advertising
background image

AN1 Series

Installation Instructions

6

INSTALLATION

Determining Location

Figure 1

46.00”

6.50”

HEIGHT FROM FLOOR

CENTER OF S

CREE

N

FLOOR

73.00”

2

2.75”

STUDS

1

2

3

5

1.

Determine desired height of screen (measured from floor).
(See Figure 1)

2.

Determine desired center of screen. (See Figure 1)

3.

Measure 6.5 inches up from desired height (top) of screen
and 2.75 inches to the right of center of screen and mark
location. (See Figure 1)

4.

Determine location of studs behind drywall.

5.

Drill one pilot hole (see Table 1 for size) at location marked
in Step 3 (See Figure 1) and follow fastener information
(appropriate for wall type) located in Table 1.

IMPORTANT ! : See Fastener Installation Methods at
end of Installation Instructions for details on installing
product into various wall types.

Table 1: Fastener Information

WALL TYPE

PILOT
HOLE

FASTENERS (see
PARTS drawing)

Drywall only-
(boom attach
only) /
Steel studs

1/2"

1/4-20 Toggler anchor kit (C,
D, E
)

- 1/4-20 x 1-3/4" Phillips
screw (C)

- 1/4" washer (D)

- 1/4-20 Snap toggler (E)

Wood stud

1/8"

1/4 x 2-1/2" hex head lag (A)

Concrete

8mm x 80mm

(Only for
installing
screen bracket
into concrete)

6mm x 45mm

1/4 x 2-1/2" hex head lag (A)

Hilti Hud-L #8x60 anchor (B)

#8-9x1-1/2" Phillips screw(L)

Toggler AF6 (M)

Advertising