CHIEF SL220 User Manual

Page 10

Advertising
background image

SL220

Installation Instructions

10

IMPORTANT ! :

Select power cord (W or X) suitable for

location. If neither of those cords are suitable for your location,
use a power cord that has an attachment plug on one end that
meets IEC-60320 and on the other end is appropriate for use
with the grounded main outlet.

2.

Plug power cord into IEC inlet on rear panel inside SL220.
(See Figure 11)

Figure 11

WARNING:

PINCH HAZARD! FINGERS OR HANDS

BETWEEN MOVING PARTS CAN LEAD TO SEVERE
PERSONAL INJURY! Keep fingers and hands away from
mount when operating.

3.

Open and fully extend SL220 using remote control
following instructions included with the remote control and
instructions in the Remote Control Capabilities section.

4.

Remove power cord.

Removing Projector Cradle (Optional)

NOTE:

Removing the projector cradle is optional, but

recommended for a single person installation. If NOT
removing projector cradle, proceed to Placing SL220
into Ceiling Structure
section.

1.

Remove and save Phillips head screw and disconnect the
grounding strap leading from inside front of SL220 to
projector cradle. (See Figure 12)

2.

Loosen the screws in the linkage on each side of projector
cradle at rear of SL220. (See Figure 13)

3.

Gently pull projector cradle away from sides at rear of
SL220. (See Figure 14)

4.

The forward/aft adjustment screws may need to be
loosened for this. If so, loosen the screws, but do NOT
remove the screws. (See Figure 13)

Figure 12

Figure 13

(Some parts removed
for clarity)

2

Plug in
power cord

IEC inlet

Front of
SL220

x 1

1

Grounding strap

x 2

2

Front of SL220

Adjustment
screws

Adjustment
screws

Advertising