Preparing the sl220 – CHIEF SL220 User Manual

Page 9

Advertising
background image

Installation Instructions

SL220

9

WARNING:

IMPROPER INSTALLATION CAN LEAD TO

LIFT FALLING CAUSING SEVERE PERSONAL INJURY OR
DAMAGE TO EQUIPMENT! It is the installers responsibility
to make certain the structure to which the lift is being
mounted is capable of supporting five times the weight of the
lift and all attached equipment. Reinforce the structure as
required before installing the lift.

NOTE:

The following instructions assume a suitable mounting

structure and surface exists prior to installation and all
power and signal wires and cables have been properly
installed.

Electrical Rating

100-250VAC~, 50/60Hz, 960W

North America: 120VAC, 60Hz, 8A

IMPORTANT ! :

This product must be grounded. If it should

malfunction or break down, grounding provides a path of least
resistance for electric current to reduce the risk of electric
shock.

Grounding Instructions

This product must be connected to a grounded metal,
permanent wiring system, and must be properly installed and
grounded in accordance with all local codes and ordinances.

This product is suitable for use in Other Environmental Air
Spaces in Accordance with Section 300.22(C) of the National
Electrical Codes, 2008.

WARNING:

RISK OF ELECTROCUTION! All electrical

wiring required for installation should be installed by a
qualified electrician.

IMPORTANT ! :

The appropriate outlet being installed must

be the grounding type and properly grounded in accordance
with all local codes and ordinances.

3.

Wire outlet into junction box in accordance with all local
codes and ordinances.

PREPARING THE SL220

Carefully inspect the SL220 for any shipping damage. If any
damage is apparent, do NOT continue with the installation.
Instead, contact Chief for further instructions.

Removing Ceiling Pan

1.

Place SL220 upside down on clean surface.

NOTE:

The SL220 is shipped with the ceiling pan

disconnected, but in place.

2.

Remove ceiling pan and set aside.

Installing IR Sensor and Power Cord

The IR sensor placement is crucial to proper operation of the
SL220.

1.

Plug IR sensor (S) into control box. (See Figure 10)

NOTE:

The final location of the sensor won’t be made until

after the SL220 is installed into the ceiling.

Figure 10

Front of
SL220

1

Plug in IR
Receiver

(Some parts

for clarity)

removed

Advertising