Placing sl220 into ceiling structure – CHIEF SL220 User Manual

Page 11

Advertising
background image

Installation Instructions

SL220

11

Figure 14

5.

While still pulling the projector cradle away from the sides of
the SL220, slide front channels towards back, off of
bearings and remove projector cradle from SL220. (See
Figure 15)

Figure 15

PLACING SL220 INTO CEILING STRUCTURE

1.

Orient SL220 so that the rear of the SL220 (with the
electrical opening) lines up with the outlet box attachment
plate (H) on the SL220 frame. (See Figure 16)

2.

Lift SL220 (A) into place through the SL220 frame (B). (See
Figure 16) Ensure that there are four audible clicks---each
corner hook "clicking" into place onto the frame. (See
Figure 17)

3.

Lower onto SL220 frame, carefully lining up outlet box
attached to SL220 frame, with opening at rear of SL220.
(See Figure 17)

4.

Secure the SL220 (A) to the SL220 frame (B) using four
8-32 x 1" Phillips head screws (L), two in the front and two
in the back of the SL220. (See Figure 17)

5.

Secure the outlet box attachment plate (H) to the SL220
using one 8-32 x 1" Phillips head screw (L). (See Figure 17)

Figure 16

Figure 17

3

Front of SL220

3

Front Channel
Bearings

3

3

Front Channels

4

Rear of
SL220

Front
Channels

Rear of
SL220

(H)

2

(B)

Electrical
Opening

(A)

5

(L) x 1

3

4

(L) x 4

2

Corner
Hook

(A)

(B)

3

Advertising