Evmu – EBARA EVMU User Manual

Page 7

Advertising
background image

Ebara Stainless Steel Vertical Multistage

EVMU

Instructions and Operation

Ebara

Fluid Handling

www.pumpsebara.com

7

(t) 803 327-5005 • (f) 803 327-5097

rev. 11/10

3.9

Priming the Pump
Completely prime the pump by removing the vent plug (212).

Using a funnel, fill the pump body with water until it overflows and replace plug.

Alternatively for installations with positive suction heads, close the discharge valve and remove
the vent plug.

Open the suction valve until liquid flows out of the vent plug opening and then replace the vent
plug securely and open discharge valve.

3.10 It is recommended that a bleed valve be installed in discharge line or in a line from the vent

port to the reservoir. This will allow the pressure in the pump to be relieved for service.

3.11 Pipe, valves and fittings must have a pressure rating equal to or greater than the maximum

system pressure.

3.12 A bypass or pressure relief valve should be installed in the discharge line if there is any possibility

the pump may operate against a closed valve in the discharge line.

Minimum flow is required for proper cooling and lubrication of the pump without which, damage
and premature failure will occur.

Minimum Pumping rate

Model

Minimum Flow rate

EVMU 3

3.3 GPM

EVMU 5

6.7 GPM

EVMU 10

8 GPM

EVMU 18

11 GPM

EVMU 32

61 GPM

EVMU 45

112 GPM

EVMU 64

149 GPM

INSTaLLING a bLEED VaLVE IS ESPECIaLLy NECESSary IN HOT WaTEr aPPLICaTIONS
TO PrEVENT INjUry.

CaUTION

!!

ExTrEME CaUTION SHOULD bE USED IF PrIMING THE PUMP IN THIS MaNNEr IN a HOT
WaTEr aPPLICaTION.

CaUTION

!!

Advertising