Mounting for an installation with 2 collectors, Ab c 20 0 – DE DIETRICH NEO 2.1 User Manual

Page 22

Advertising
background image

4.5.6.

Mounting for an installation with 2
collectors

n Positioning the solar collectors

A

Screw the lower fastening lugs onto the bottom batten.

B

Position the collectors. The fastening lugs must be fitted

into the holding groove.

C

Postion the upper fastening lugs in the holding groove on

the collectors and screw them onto the batten.

The solar panels should only be installed shortly before the solar-

heating system is to be commissioned. This will minimise the time that

the solar panels are exposed to heat while not filled with heat-

transporting fluid.

C003581-A

66