4.5.7.
Mounting for an installation with 3 to 5
collectors
n Positioning the solar collectors
A
Screw the lower fastening lugs onto the bottom batten.
B
Position the collectors. The fastening lugs must be fitted
into the holding groove.
C
Postion the upper fastening lugs in the holding groove on
the collectors and screw them onto the batten.
The solar panels should only be installed shortly before the solar-
heating system is to be commissioned. This will minimise the time that
the solar panels are exposed to heat while not filled with heat-
transporting fluid.