Mounting for an installation with 3 to 5, Collectors, Ab c 20 0 – DE DIETRICH NEO 2.1 User Manual

Page 36

Advertising
background image

4.5.7.

Mounting for an installation with 3 to 5
collectors

n Positioning the solar collectors

A

Screw the lower fastening lugs onto the bottom batten.

B

Position the collectors. The fastening lugs must be fitted

into the holding groove.

C

Postion the upper fastening lugs in the holding groove on

the collectors and screw them onto the batten.

The solar panels should only be installed shortly before the solar-

heating system is to be commissioned. This will minimise the time that

the solar panels are exposed to heat while not filled with heat-

transporting fluid.

C003579-A

66

0

40

0

24

5

66

0

C

C

C

C

C

C

A+B

A+B

A+B

A+B

A+B

A+B

66

0

66

0

A

B

C

20

0

4. Installation

NEO 2.1 / SUN 211

35

30/11/2011 - 300021356-001-F

Advertising