DE DIETRICH AFC 18 - AFC 24 - AFC 30 User Manual

Page 30

Advertising
background image

6. Bleed the radiators. Start with the lower floors.

7. Open the bleed connection using the bleed key provided whilst

keeping a rag pressed against the connection.

8. Wait until water comes out of the bleed valve and then close the

bleed connection.

CAUTION

The water may still be hot.

9. Switch on the boiler.
10.Check whether the pressure in the installation is still sufficient.

If the water pressure is lower than 0,8 bar, more water

should be added. If necessary, top up the water level in the

heating system (recommended hydraulic pressure

between 1,5 and 2,0 bar).
¼See chapter: "Filling the system", page 26

T000854-A

3

1

4

5

2

T000217-A

T000218-A

5. Checking and maintenance

AFC 18 - AFC 24 - AFC 30

29

09/01/2014 - 300026440-001-03

Advertising