background image

2-2

Section 2 Installation

Model GT1000 Series

Installation and Operation Manual

X-VA-GT1000-eng

Part Number: 541B078AAG

March, 2014

2-4 Return Shipment

Prior to returning any instrument to the factory visit the Brooks website
www.BrooksInstrument for a Return Materials Authorization Number (RMA#),
or contact one of the following locations:

Brooks Instrument
407 W. Vine Street
P.O. Box 903
Hatfield, PA 19440 USA
Toll Free (888) 554 FLOW (3569)
Tel (215) 362 3700
Fax (215) 362 3745
E-mail: [email protected]
www.BrooksInstrument.com

Brooks Instrument

Brooks Instrument

Neonstraat 3

1-4-4 Kitasuna Koto-Ku

6718 WX Ede, Netherlands

Tokyo, 136-0073 Japan

P.O. Box 428

Tel +81 (0) 3 5633 7100

6710 BK Ede, Netherlands

Fax +81 (0) 3 5633 7101

Tel +31 (0) 318 549 300

Email: [email protected]

Fax +31 (0) 318 549 309
E-mail: [email protected]

All flow instruments returned to Brooks requires completion of Form
RPR003-1, Brooks Instrument Decontamination Statement, along with a
Material Safety Data Sheet (MSDS) for the fluid(s) used in the instrument.
Failure to provide this information will delay processing by Brooks personnel.
Copies of these forms can be downloaded from the Brooks website
www.BrooksInstrument.com or are available from any Brooks Instrument
location listed above.Instrument must have been purged in accordance with
the following:

2-5 Transit Precautions

To safeguard against damage during transit, transport the instrument to the
installation site in the same container used for transportation from the factory
if circumstances permit.

2-6 Installation

A. Location

For proper operation of the GT 1000 flowmeter it must be mounted within

6 degrees of true vertical, with the inlet connection at the bottom of the
meter, and the outlet at the top. The use of a plumb-bob, level or other
device to assure vertical positioning is recommended.