Measures to be taken before putting into service, Pulse operation, English – Burkert Type 6519 User Manual

Page 18: Function

Advertising
background image

16 - 6518 / 6519

I

NSTALLATION

, I

NITIALISATION

AND

S

ERVICE

english

Measures to be taken before putting into service

Check all connections, voltages and the operational pressure!

Ensure that the max. operational conditions (see rating plate) will not be exceeded!

Check that Ports 1, 3 and 5 are correctly connected according to the regulations. These connections

must not be interchanged for any reason!

When operating electrically, unlock the manual override!

Pulse operation

Function:

ATTENTION!

Observe the “Pulse” data on the rating plate!
Avoid simultaneous pulse input to both coils!

The pulse-controlled solenoid valves operate with two coils connected alternately.

NOTE

The valves can be reversed with the manual actuator.

Advertising
This manual is related to the following products: