Fluidic commissioning, Elektrical installation electrical commissioning – Burkert Type 8644 User Manual

Page 17

Advertising
background image

8644/Rockwell - 13

I

NSTALLATION

/ C

OMMISSIONING

bar

Switch on the pressure supply.

Only then switch on the voltage!

Fluidic commissioning

Check the connections, voltage and operating pressure!

Make sure that the max. operating data (see rating plate) are not exceeded!

Check allocation according to instructions of ports 1 and 3 or 5: these shall under no circumstances be
swapped!

For electrical operation, unlock the manual override!

Measures to be taken before fluidic initialization

Fluidic commissioning

All the necessary steps for this should be taken from the Rockwell Operating Instructions Chapter 2 „Wiring
the Adapter“.

All the necessary steps for this should be taken from the Rockwell Operating Instructions Chapter 3 „How
to Configure Point I/O Modules“.

Elektrical installation

Electrical commissioning