GASS-2040 User Manual | Original Instructions

1.1 Flange Mounting

a.

Once the system has been lifted up to the platform, set the system down on blocks
(Short lengths of 2x4 studs or equivalent). The blocks will protect the utility
connections from damage and allow the system to be positioned upright on the
platform deck.

b.

Install the mounting flange on the system by threading it on to the protruding nipple
that exits the back of the system and tighten. Be sure to align the bolt hole pattern
with that of the mating flange on the stack nozzle.

c.

If the probe pipe is less than two feet in length, it can be installed and tightened.

d.

If the probe is longer than two feet, it may be necessary to slide the probe pipe into
the stack nozzle first. This depends on how wide the platform is or if there is
physically enough space to be able to back the system away from the stack with the
probe pipe attached.

e.

At this point, an appropriately sized flange gasket should be installed on the system
flange. Attaching the gasket to the flange with a small amount of tape at the edge of
the gasket will hold it in place temporarily.

f.

If space is limited, slide the probe pipe into the stack nozzle and hold on tightly.

g.

Lift the system up to the nozzle and install the probe pipe on the system and tighten.

h.

Mate the two flanges, install the mounting bolts and tighten.

1.2 Support Installation

Once the system has been mounted on the flange, supports must be installed to prevent it
from swinging on the hinged flange mount. Two Unistrut compatible angle brackets are
mounted to the lower corners of the enclosure to allow attachment. Due to the wide variety
of possible support configurations, this is left up to the customer. The supports can be
placed vertically to the deck or horizontally to the stack wall or any other convenient angle
as long as they are rigidly attached by welding or mechanical fastening.