Perma Pure Modular Board User Manual

Page 15

Advertising
background image


1

St

Frozen

DIP Switch 1, 2 and 3 are OFF, OFF and ON.
Menu

Item

Display Range


Set Point 1

SP1

-10 to 25 °C

Ready

1 rd1

-10

to

25

°C

Cycle

Time

CYC

1

to

18

Hours

Crossover Time

Cot

15 to 45 minutes


Set Point 1 is the temperature the cooler will try to maintain the impinger at
during operation.


Ready 1 is the temperature that impinger must be below to turn on the relay and
external equipment (i.e. sample pump)

Cycle Time is the length of the frozen period for each impinger.

Crossover Time is the period of time that both impingers are active to allow the
thawed impinger to cool to freeze prior to switch over.

2

nd

Frozen

DIP Switch 1, 2 and 3 are OFF, OFF and ON.
Menu

Item

Display Range


Set Point 1

SP1

-10 to 25 °C

Ready

1 rd1

-10

to

25

°C


Set Point 1 is the temperature the cooler will try to maintain the impinger at
during operation.


Ready 1 is the temperature that impinger must be below to turn on the relay and
external equipment (i.e. sample pump)

Note all timing is controlled by the 1

st

frozen control board.


Dual Channel Cooler
DIP Switch 1, 2 and 3 are OFF, ON and OFF.
Menu

Item

Display Range


Set Point 1

SP1

-10 to 25 °C

Ready

1 rd1

-10

to

25

°C

Set Point 2

SP2

-10 to 25 °C

Ready

2 rd2

-10

to

25

°C

Display dSP

Toggle

or

Switch

Advertising