Installation – Fulton Alliance (FT-HC) Horizontal Coil Thermal Fluid (hot oil) Heater User Manual

Page 11

Advertising
background image

Questions? Call (315) 298-5121, or visit us online at www.fulton.com

SECTION 2

FTHC-IOM-2012-1001

INSTALLATION

2-5

5. If positive forced ventilation is adopted, ensure that

there will be no appreciable pressure variation in the
equipment room.

6. Avoid ventilation which creates a negative pressure

in the building as it will seriously aff ect combustion
and proper operation of the stack. Please note that
exhaust fans or similar equipment can create a down
draft in the chimney or starve the burner’s air supply.
Either case may result in poor combustion or nuisance
failures. A properly designed make-up air system in the
equipment room will preclude these possibilities and is
required to maintain proper combustion.

FIGURE 1 -COMPONENT VIEW OF THE FTHC HERMAL FLUID HEATER

Notes:

1. The burner fi res down the center of the coil.

2. The hot gases return between the coils to the front end plate,

then fl ow to the back of the heater and exit out the fl ue.

TABLE 3- APPROXIMATE FLOOR LOADING

(BASED ON OPERATING WEIGHT)

Model

Heater Only*

FT-0240-HC

125

FT-0400-HC

200

FT-0600-HC

260

FT-0800-HC

200

FT-1000-HC

300

FT-1200-HC

300

FT-1600-HC

325

FT-2000-HC

300

*All weights are lbs/ft2

Advertising