Maintenance – Fulton Alliance (FT-HC) Horizontal Coil Thermal Fluid (hot oil) Heater User Manual

Page 67

Advertising
background image

Questions? Call (315) 298-5121, or visit us online at www.fulton.com

SECTION 4

FTHC-IOM-2012-1001

MAINTENANCE

4-3

!

WARNING

All information in this manual is for
reference and guidance purposes,
and does not substitute for required
professional training, conduct,
and strict adherence to applicable
jurisdictional/professional codes and
regulations.

Crystalline silica may be present
in components of this equipment.
Exposure to crystalline silica may
pose signifi cant health hazards,
including but not limited to eye and
respiratory system damage. Per
the Centers for Disease Control and
Prevention (CDC) and Occupational
Safety and Health Administration
(OSHA), appropriate Personal
Protective Equipment must be worn
to minimize exposure to hazardous
substances. Refer to most current
guidelines off ered by the CDC and
OSHA for more information, including
Personal Protective Equipment
recommendations.

Fluids under pressure are hazardous
and may cause injury to personnel, or
equipment damage, when released.
Shut off all incoming and outgoing
fl uid shutoff valves and carefully
decrease all trapped pressures to zero
before performing any maintenance.

Never use open fl ame or other sources
of ignition to check for gas leaks.

4

CAUTION

All maintenance procedures should
be completed by trained personnel.
Appropriate training and instructions
are available from the Fulton Service
Department at (315) 298-5121 or your
local Fulton Thermal Representative.

5. Check the exhaust for the presence of smoke. If smoke is present,

contact Fulton Companies at (315) 298-5121 or contact your local Fulton
Representative.

6. In systems utilizing linkage, check all linkage components for tightness.

See Figure 20.

7. In systems utilizing a water cooled thermal fl uid circulating pump, check

level of lubricating oil in self-leveling reservoir and check cooling water
circulation loop for proper operation. See Figure 21.

FIGURE 20 - LINKAGE COMPONENTS

FIGURE 21 - WATER-COOLED THERMAL FLUID CIRCULATING PUMP

Advertising