12 lifter assembly, 13 pump unit to chassis assembly, 14 canopy assembly procedure – SPP Pumps Auto Prime Q Series - Workshop Manual User Manual

Page 26

Advertising
background image

Manual No/Rev

W72-021E / 8

Workshop Manual for

AUTOPRIME Q Range Pump Units

Our policy is one of continuous improvement and we reserve the right to alter specifications at any time

Page 26 of 36

7.12 Lifter Assembly

7.12.1 Lifter Parts Diagram

7.12.2 Lifter Parts List

ITEM

DESCRIPTION

PART No

QTY

1

Lifter A/Prime Heavy Duty

18447

1

2

Screw M20 X 50

21863-394-959-6

3

3

Washer Spring M20

21174-309-927-7

3

4

Strut Lifter Support

13743

1

5

Spacer Lifter Strut 5mm

14459.221

1

6

Bolt M16 X 40

21863-312-959-2

2

7

Washer Spring M16

21174-308-927-0

2

8

Bolt M12 X 35

21863-220-959-0

2

9

Washer Spring M12

21174-307-927-3

2

10

Nut M12

21882-675-959-7

2

11

Rope Wire Lifting

15483

1

12

Spacer Lifter Cable

15499

1

13

Washer 50 OD X 21 ID X 5
Thick

15500

2

14

Bolt Hexagon M20 X 90

21867-402-374-6

1

15

Nut M20 Self Locking

SY9509868

1

7.13 Pump Unit to Chassis Assembly

1.

Raise the engine & pump unit with a crane
using the lifter position the unit above the
chassis assembly with the engine to the
rear end.

2.

Ensure that the pump and engine
mountings

are

correctly

fitted

and

orientated to align with the chassis fixing
holes.

3.

Lower the unit into the chassis and connect
the drain hoses for the engine sump, pump
volute, non-return valve and the coalescer.

4.

Lower the unit into its final position and fix
in place with the bolts provided.

5.

Fit the battery tray and battery as per the
diagram in section 6.2.2.

6.

Fit the priming system sensing probe
assembly and leave the control box loose
ready for mounting on the baffle plate on
the canopy support frame.

7.14 Canopy Assembly Procedure

7.14.1 Door Preparation

1.

Clean and adjust the position of the hinge
support tube to be flush with the front hinge
face.

2.

Fit the spacer washer (18) and the hinge
bracket (17) over the tube that protrudes at
the rear hinge face.

3.

Attach the bracket to the door with three
crews (19).

4.

Fit the gas spring (23) to the hinge bracket
using the pin, two spacers and clevis pin
(30, 28 & 29).

5.

Fit the lock plate (20) and the lock (22)
using the bolts (21).

7.14.2 Canopy Assembly & Fitting

Note The canopy may be partly assembled

before fitting to the chassis if required, but
may also by assembled after mounting on
the chassis for ease of access.

1.

Assemble and fit the control panel door
complete with instruction label in the
required language. (The label may be fitted
later, if preferred)

2.

Fit the insulation materials and cable clips
where possible at this stage.

3.

For QI 100 & QI150 pumps, fit the radiator
extension to the radiator panel and fit the
panel to the support frame.

4.

Using suitable lifting equipment, lower the
canopy support assembly on to the chassis
ensuring that the lifter passes through the
central slot in the roof.

5.

Grease the door hinge pins (31) and insert
into the outer ends of the hinge blocks in
the canopy support frame (2).

6.

Fit the main canopy doors and push he
hinge pins into the hinge support tubes.

7.

Fit the lower end of the gas springs to the
canopy support frame using cap screw,
washers and nut (25, 24, 26 & 27). Apply
copper grease to the cap screw threads.

8.

Fit the rear air duct to the radiator panel
and support frame.

9.

Fit the louver tray to the louver and mount
these in position on the support frame.

10.

Note The louver and front cover may be
fitted later to allow access to the pump and
priming system end during assembly.

11.

Mount the six shroud supports (Chassis
Diagram Item –11) on the chassis frame

12.

Secure the canopy assembly to the chassis

Advertising