Before you begin installation – Lanair MXB360 User Manual

Page 2

Advertising
background image

®

BEFORE YOU BEGIN INSTALLATION...

Read and understand this manual completely before beginning installation.

Code Requirements

Installation must comply with all state, local and utility codes, laws, regulations and ordinances and CSA standard
B139. When required, installations must conform to A.S.M.E. safety code for controls and safety devices for
automatically fired boilers No. CSD-1.

All electrical wiring must be done by a licensed electrician in accordance with the National Electrical codes latest
edition and all state and local codes.

Rules for Safe Installation and Operation

1. This boiler is for commercial and industrial use only. This unit is not intended for residential use.

2. This boiler must be installed by a licensed HVAC/Hydronic contractor. Installer should be trained and thoroughly

familiar with the installation and operation of oil-fired boilers.

3. Read this owner's manual and the rules for safe operation carefully. Failure to follow the rules of safe operation

and the instructions could cause a malfunction of the boiler and result in death, serious bodily injury, and/or
property damage.

4. Locate the boiler as close to the chimney as practical. Observe the minimum clearances outlined in Fig. 1,

page 8. Remember to allow room for the boiler door to open with the burner mounted.

5. Make sure that the surface on which the boiler is to be installed is capable of supporting the weight of the boil-

er, burner, and all other equipment supported by that surface.

6. A boiler pad is strongly recommended . This pad is to be made of poured concrete. It should be at least 4 inches

thick and should cover the entire area underneath the boiler (not just the legs).

7. Make sure the location chosen for the boiler will provide adequate air for combustion and ventilation (see Fig. 2,

page 9). Also make sure that fuel and electrical requirements can be satisfied at the boiler location chosen.

8. The heating system design shall not permit the boiler's return water temperature to be lower than 130˚F for a

significant period of time. This will prevent fire side corrosion and insure a long life expectancy for your boiler.

9. Check to make sure you have all the required components needed for proper installation and operation.

10. Check each component for visible damage. If you find a damaged component, contact a Lanair Service

Representative for a replacement. Do not install broken or damaged parts.

11. This boiler is designed to provide economically and environmentally friendly disposal of waste oil. Due to the

nature of the fuel used, this boiler should not be relied upon as the sole source of heat.

12. Read and understand the warranty. Fill out the enclosed warranty card and return within 10 days of purchase.

QUESTIONS?... Contact Customer Service at 1-800-753-1601 M-F 8:00 am- 4:30 pm CST

2

Advertising