N O T E

> The HV is interlocked electrically with

the trigger switches. When a fluid switch

is triggered on, the HV will automatically

be turned off.

Figure 7: Fluid Selector Switch Position

Figure 8: Fluid Supply Switch

Figure 9: Fluid Enable Switches

Figure 10: Paint #1 & Paint #2 Dump Toggle Switches

TROUBLESHOOTING -

HV TEST

If the voltage display of the MicroPak reads less than 90

kV or the current draw is above 20 µA with the MicroPak

kV and µA potentiometer adjusted fully clockwise, the

fluid lines may need to be purged or the voltage test bag

is leaking current and voltage to the air. If you have no

voltage reading at all, proceed to “HV Troubleshooting”

in this section. If you have voltage, check to make sure

the voltage test bag is secured tight to the applicator.

If it is, follow the procedure “Blow The Fluid Lines Out.”

Blow The Fluid Lines Out

1. Turn the MicroPak voltage off at the switch on

panel and also at MicroPak.

2. Remove the voltage containment bag from the

end of the applicator.

3. Remove the front shroud and bell cup from the

end of the applicator (this prevents flooding of

the turbine motor assembly).

4. Turn the fluid selector switch to the “Air” posi-

tion. (See Figure 7)

5. Set RMA-202 types either single or dual fluid

type. (See Figure 8)

6. Trigger Paint #1 toggle switch in the “Fluid En-

able” section of the panel. Trigger Paint #2

toggle if so equipped with dual fluid.

7. Trigger the Paint #1 dump and the Paint #2

dump toggle switch to blow out any excess wa-

ter.

8. After (2) to (3) minutes of purging with air, in-

spect the fluid dump lines visually to determine

if all the fluid has been pushed out of the lines.

Turn Dump #1 and Dump #2 to Off position in

the “Application Enable” section.

9. Trigger the (2) paint lines (Paint #1, Paint #2,

and solvent) material in these areas and Paint

#1, Paint #2, and solvent triggers in the “Appli-

cator Enable” to purge all fluid from bell. Fluid

coil should be free and clear of all fluids.