Robertshaw RS6320 User Manual

Page 12

Advertising
background image

12

Press

to step through the following:

The display will now show the day, the
setpoint, fan setting and off.

Exiting the Installation Test Utility returns the
thermostat to normal operation.

Refer to the User Manual to change day, time and schedule.

The Thermostat is now ready to begin operation.

The thermostat will be in the OFF (default) mode at start up.

The following sections will explain how to select the mode of operation
and how to protect the settings.

Installation Tests for Multi-Stage Models

Conventional (Non-HP)

Heat Pump (HP)

Demand

Terminal

Display

Terminal

Display

First Stage Heat

W1 + G*

Y1 + G + B

Second Stage

Heat

W1 + W2 + G*

2

Y1 + W2 +G + B

2

Third Stage /

Emergency Heat

N/A

E + G

E

First Stage Cool

Y1 + G

Y1 + G + O

Second Stage

Cool

Y1 + Y2 + G

2

Y1 + Y2 + G + O 2

* G,

will be off (not displayed) for Non-HP with Gas

Installation Tests for Single Stage Models

Conventional (Non-HP)

Heat Pump (HP)

Demand

Terminal

Display

Terminal

Display

First Stage Heat

W1 + G*

Y1 + G

First Stage Cool

Y1 + G

Y1 + G + O

* G,

will be off (not displayed) for Non-HP with Gas.

Advertising
This manual is related to the following products: