Accessories, Part number description contents – Sotera DEF User Manual

Page 9

Advertising
background image

9











Bold text
indicates repairs that are not serviceable by the owner; pump must be returned to
the point of purchase for repairs.

If you have questions regarding installing, operating, or servicing your product, please feel
free to contact our Customer Service Department at 1-800-634-2695 (M-F 8 AM–5 PM EST).
You can also reach us on the World Wide Web at “www.tuthill.com”.





Accessories

A wide variety of accessories are available to help you maximize the performance of your
Tuthill / Fill-Rite pump. Listed below are the applicable available accessories for your specific
product. Please contact your Tuthill / Fill-Rite distributor to purchase the accessories you
need.




Part Number

Description

Contents

FRSA120801MATU Tote

Kit

115 VAC DEF Pump, platform, hose retractor &
rod, digital meter, automatic nozzle, 8 GPM.

FRSA140801MATU Tote

Kit

115 VAC DEF Pump, platform, hose retractor &
rod, digital meter, automatic nozzle, 8 GPM.

FRSD120801MATU Tote

Kit

12 Volt DC DEF Pump, platform, hose retractor &
rod, digital meter, automatic nozzle, 8 GPM.

FRXSA120801MATU Tote

Kit

115 VAC Explosion Proof DEF Pump, platform,
hose retractor & rod, digital meter, automatic
nozzle, 8 GPM.

FRXSA140801MATU Tote

Kit

115 VAC Explosion Proof DEF Pump, platform,
hose retractor & rod, digital meter, automatic
nozzle, 8 GPM.

KITFR55DU Drum

Kit

Roller Base

Platform

Drum Lock Bar

825D075BSPP

Digital Meter

Sotera 825 Series Digital Meter

075UMN11

¾” Nozzle

¾” Manual Nozzle

FRH7514

14’ x ¾” Hose

14’ X ¾” Hose with Static Wire

WARNING! DO NOT open or attempt to repair the motor on your Tuthill pump.
Return it to the place of purchase for service. Opening the motor case can
compromise the integrity of the Explosion Proof construction (if equipped with an
Explosion Proof motor) and will void any existing warranty and certification (UL
listing).

*

IMPORTANT INFORMATION ON DEF “CRYSTAL LOCKED” ROTORS: DEF will

crystallize almost immediately upon contact with air; if air gets to the DEF in the rotor cavity,
it can crystallize the DEF and lock the rotor in place. If this occurs, the following procedure
will clear the vanes of crystals and return the pump to operation:
1) Remove the strainer cover
2) Pour de-ionized water into the strainer opening; the DEF crystals will dissolve instantly.
3) Reinstall strainer cover and torque to 50 inch lbs.
4) Pump at 5 - 10 gallons of DEF through the system to flush the water from the pump.

Advertising