Heating cable installation – King Electric SR self-reg, cut to length User Manual

Page 8

Advertising
background image

PREPARE FOR INSTALLATION

1. Store the heating cable in a clean, dry place.

2. Inspect for any mechanical damage prior to installation.

3. Warranty is void if non-King accessories are used. King
approved accessories include:

- SRK00 Power connection kit
- SRK03 Fiberglass tape and labels
- SRK08 GFEP plug-in connection kit
- SRK10 Splice and tee kit
- SRK12 End seal kit
-SRK13 Roof clips
- SRK15 Downspout hanger bracket

4. Gutters and downspouts must be free of leaves and other
debris.

5. Carefully plan the routing of the heating cable for roof and

gutter deicing.

6.

Inspected the mounting surface for sharp edges and remove

as anything that could damage the cable.




Figure 3: Shake and Shingle Roof Attachment

Figure 4: Metal Roof Attachment

Eave

overhang

Tracing

width

Tracing

height

Cable/roof

edge

None

24”

18”

2.0 ft

12”

24”

18”

2.8 ft

24”

24”

30”

3.8 ft

36”

24”

42”

4.8 ft

Eave

overhang

Tracing

width

Tracing

height

Cable/roof

edge

None

18”

18”

2.5 ft

12”

18”

24”

2.8 ft

24”

18”

36”

3.6 ft

36”

18”

48”

4.3 ft

None

24”

18”

2.0 ft

12”

24”

24”

2.4 ft

24”

24”

36”

2.9 ft

36”

24”

48”

3.6 ft

Heating Cable Installation

Table 7: Tracing Heights for Shake and Shingle Roof

Table 8:Tracing Heights for Metal Seam Roof

The last column gives the amount of cable required per foot of
roof edge for standard shake and shingle roof (table 7) or a
metal seam roof (table 8).

·

STEP1: CUT THE HEATING CABLE TO LENGTH

1. Cut the heating cable to length required. This can be done
before or after it is installed. Leave a minimum of 1 foot extra
heating cable for power connection. For splice connections
leave a minimum of 2 ft, and 3 ft for each tee connection.

STEP 2: ATTACH THE HEATING CABLE ON ROOFS

1. Loosely loop the heating cable on the roof at the overhang

area. Pull the bottom of each heating cable loop over the roof
edge and, using a UV-resistant cable tie as. Connect the
bottom of each loop to the cable running in the gutter. This will
ensure a drainage channel for the melting ice to drain off the
roof and into the gutter and downspout. The cable in the gutter
should remain against the bottom of the gutter as shown in
Figure 3 (Standard Roof) and Figure 4 (Metal Roof).

2. Extend the top of each heating cable loop beyond where the

wall joins the roof.

3. Use SRK13 roof clips to route heating cable up and down the

edge of the roof according to the tracing height noted in the
tables above and shown in Figures 6 and 7. Route the heating
cable in such a way as to prevent abrasion to the cable jacket.

Rev 11.04.12

www.king-electric.com

8

Advertising
This manual is related to the following products: