En g l is h english, Faucet installation – Pfister GT49-CB0Y User Manual

Page 2

Advertising
background image

E

N

G

L

IS

H

ENGLISH

ENGLISH

3

4

2

FAUCET INSTALLATION

5

6

Thank you for purchasing this Price Pfi ster product. All Price Pfi ster products are carefully engineered, and factory tested to
provide long trouble-free use under normal conditions. This product is easy to install using basic tools and our easy to follow
illustrated instructions. If you have any questions regarding this product, call 1-800-Pfaucet (1-800-732-8238).

1 BEFORE PROCEEDING

WARNING: Read all the instructions completely before proceeding. Price Pfi ster

recommends calling a professional if you are uncertain about installing this product!
This product should be installed in accordance with all local and state plumbing and
building codes.

NOTE: If installation surface depth is thicker than 1

1

/

2

”, order spare part

number 971-026.

2 SHUT OFF WATER SUPPLY

Locate water supply inlets and shut off the water supply valves. These are usually found
under the sink or near the water meter. If you are replacing an existing faucet, remove
the old faucet from the sink and clean the sink surface thoroughly.

3 TOOLS RECOMMENDED

• PTFE Plumber's Tape

• Plumber's putty

• Slotted screwdriver

• Phillips head screwdriver • Pliers

• Adjustable wrench

• Flashlight

• Cloth

Your installation may require new supply lines and / or shut-off valves or other additional
tools.

4 CHECKING THE CONTENTS OF THE BOX

Upon opening the box, check to ensure that all of the following items are included.

A Spout

B Handles (2x)

C Spout Base

D Valve Bodies (2x)

E Pop-Up Assembly

F Pop-Up Rod

G Bag [Flange, Seal Ring, Plastic Nut] (2x)

H Hose

J Bag [Nuts (2x), Square Washer (2x)]

K Hex Wrench

L Bag [Nut, Mounting Washer, Seal Ring]

M Bag [Ball Rod, Strap]

If any of these items are missing, please contact Price Pfi ster Consumer Service at
1-800-Pfaucet (1-800-732-8238).

5 SPOUT ATTACHMENT

Insert Lift Rod (5A) into hole at the back of Spout (5B). Place Plastic Seal Ring (5C)
against the bottom of Spout Base (5D). Place Spout Base (5D) against the bottom of
Spout Body (5E). With Spout (5F) facing forward, carefully install the Lift Rod (5A) and
Shank (5G) through the center hole of sink (5H).

6 SPOUT INSTALLATION

From underneath sink, place Mounting Washer (6A) onto Spout Shank (6B) and align
Lift Rod (6D) with slot in Mounting Washer (6A). Make sure Lift Rod (6D) moves freely.
Be sure Spout (6E) is centered and facing forward and tighten the Mounting Nut (6C)
until Spout (6E) is fi rmly secured to sink.

2

5A

A

B

B

D

D

E

F

G

G

H

L

J

M

5F

5C

5E

5G

5D

6A

6C

6D

6D

C

K

5B

5H

5A

6E

6B

6C

Advertising
This manual is related to the following products: