En g l is h english – Pfister GT49-CB0Y User Manual

Page 4

Advertising
background image

E

N

G

L

IS

H

ENGLISH

ENGLISH

DRAIN BODY INSTALLATION

15

FAUCET FUNCTIONS

12

13

16

14

12 HOSE CONNECTION TO VALVE BODY

Slide the End Connectors (12A) with arrow (12D) pointing up onto the Valve Bodies
(12B). Push the End Connectors (12A) all the way up until completely seated. Be
careful not to damage O-Rings (12C). Place Clips (12E) onto End Bodies (12C) to
secure End Connectors (12A).

13 WATER SUPPLY CONNECTIONS

Connect water Supply Lines (13A) to Faucet Inlets (13B). Hot water supply lines go
into left inlet. Cold water supply lines go into right inlet. (Supply lines not included).
Please follow manufacturer’s instructions when installing supply lines.

14 POP-UP INSTALLATION

Install and adjust Pop-Up (14A) using separate instructions supplied with the Pop-Up
assembly.

15 UNIT START UP

Turn on hot and cold water supplies, and check for leaks above and below the sink.

16 FAUCET FUNCTION

COLD valve: close-counterclockwise, open-clockwise; HOT valve: close-clockwise,
open-counterclockwise.

Note: Flush faucet before turning on valve (see step 17).

4

13B

13A

13B

13A

HOT

COLD

HOT

COLD

OPEN

OPEN

12A

12A

12D

12D

12B

12B

12C

12C

12A

12E

12E

12E

14A

Advertising
This manual is related to the following products: