1/2 quart – MAHLE RTI ATX-3 User Manual

Page 14

Advertising
background image

Page 13

6.

Start the engine and then press the START ENGINE button. There will be 10 second delay
after START ENGINE button is pressed to allow the new fluid to intermix with fluid in
transmission system. After 10 seconds, the exchange will continue.

7.

There is a 10 second pause after each refill.

8.

If machine is unable tor retrieve more than 0.4 of a quart from the pan while engine is running,
the Flo Err (Flow Error) message will be displayed and process needs to be aborted. Stop the
process and refill fluid to match required level.

9.

When the exchange of transmission fluid is complete the buzzer will sound continuously and
the PROCESS COMPLETE light will stay illuminated until the STOP button is pressed.

10. Remove Dip Tube Hose and check dipstick for level. If necessary, the Dip Tube Hose can be

re-inserted and the +1/2, -1/2 QUART buttons pressed as required to correct fluid level.

-1/2 QUART

1.

Vehicle engine is running and the ATX-3 dip tube hose installed into transmission.

2.

Light on DIPSTICK MODE button should be illuminated. Press the -1/2 QUART button to lower
the fluid level if the transmission system is overfilled.

3.

When process is complete the buzzer will sound continuously and the PROCESS COMPLETE
light will stay illuminated until the STOP button is pressed.

4.

Remove dip tube hose from transmission.

5.

Insert transmission dipstick and check for appropriate level.

+1/2 QUART

1.

Vehicle engine is running and the ATX-3 dip tube hose installed into transmission.

2.

Light on DIPSTICK MODE button should be illuminated. Press the +1/2 QUART button to raise
the fluid level if the transmission system is under filled.

3.

When process is complete the buzzer will sound continuously and the PROCESS COMPLETE
light will stay illuminated until the STOP button is pressed.

4.

Remove dip tube hose from transmission.

5.

Insert transmission dipstick and check for appropriate level.

Advertising