Set up – MAHLE RTI MCX-2F (Rev C) User Manual

Page 5

Advertising
background image

Page 4

New Coolant Tank

Coupler

Quick

Green Hose

OFF

OFF

OFF

TES

T

SYS

TEM

VA

CUU

M

SYS

TEM

PR

ESS

URE

FILL

RA

DIAT

OR

& O

VER

FLO

W

EXC

HAN

GE C

OOL

ANT

EMP

TY W

AST

E TA

NK

LO

WER

RA

DIAT

OR

& O

VER

FLO

W

& O

VER

FLO

W

LOW

ER R

ADIA

TOR

EXC

HAN

GE C

OO

LAN

T O

R

FILL

RAD

IATO

R & O

VER

FLO

W

EM

PTY

WA

STE

TA

NK

Black Hose

Green Hose

Tank Cap & Plug

(Small)

New Coolant

SET UP

The MCX-2F has two tanks (plus an extra New Coolant Tank) which are installed and
connected from the rear. Quick connect couplers are mounted on the hoses which
connect these tanks to the MCX-2F. A green hose connects to the New Coolant Tank
(right side) and a black hose connects to the Waste Tank (left side). The small
diameter black drain hose must be inserted into the hole in the cap of the Waste Tank.

1. Slide the New Coolant Tank to the rear and sit it on the floor.

2. Remove the tank cap and fill the tank with new coolant and water in the

proportions specified by the coolant supplier. The tank can be disconnected
and moved to a bulk coolant storage area for filling if desired. A plug is provided
on the cap to prevent spillage during transport.

3. Replace the tank cap and position the tank in the MCX-2F. Make sure the

green hose is securely connected. Slide the tank to the front so the liquid level
can be seen through the front panel slot.

4. Make sure the plugs are removed from the caps on the Waste Tank and

the New Coolant Tank. This is required for venting the tanks during
operation. The small diameter black drain hose must be inserted into the
hole in the cap of the Waste Tank.

5. Fasten the clips on the tank strap to secure the tanks in the MCX-2F.

Advertising