Stuart Turner RG4000 User Manual

Page 14

Advertising
background image

- 14 -

Cont ...

b) Vertical suction models (flooded suction)

These models are supplied with priming plugs fitted. Certain models are also

available with the pump body rotated.

Priming instructions for these variants are as follows:-

The pump must be primed (filled with liquid) before starting. Turn on liquid

supply, prime and vent the pump by unscrewing the priming plug (Figs 18, or 19)

slowly until all air escapes and liquid emerges. Re-tighten the plug.

c) All models (suction lift installation)

Prime the suction pipework and pump by filling with liquid via the pump discharge

connection, or by filling the suction pipework before attaching to the pump, then

fill

the

pump.

5. Starting

a) Switch on power to the pump which will now be operational.

b) If pump has a three phase supply, confirm the direction of rotation is correct by

stopping and observing over run. The correct direction of rotation is

anti-clockwise when looking directly at the front of the pump casing. To reverse

rotation see wiring diagram section.

c) The pump should now be fully operational.

d) Carefully check pump and pipework for leaks whilst pump running and stationary

before leaving the installation unattended.

For Further Technical Support

Phone the Stuart Turner Pump Assist team on 0844 98 000 97. Our staff are trained to

help and advise you over the phone or arrange for a service engineer to call.

Note: When pumps are installed in another manufacturers original equipment, please

contact the manufacturer for advice.

Fig. 18

Fig. 19

Inlet

Inlet

Outlet

Outlet

Priming Plug

Advertising
This manual is related to the following products: