About This Guide

The Brocade ICX 7750 are Ethernet switches for campus LAN aggregation and classic Ethernet
data center Top-of-Rack (ToR) environments.

Audience

This document is designed for system administrators with a working knowledge of Layer 2 and
Layer 3 switching and routing.

If you are using a Brocade Layer 3 Switch, you should be familiar with the following protocols if
applicable to your network: IP, RIP, OSPF, BGP, ISIS, PIM, and VRRP.

Supported hardware and software

This document is specific to the Brocade ICX 7750 running FastIron release 08.0.10.

How this document is organized

The document contains the following components:

Chapter 1, “Brocade ICX 7750 Overview”

provides an overview of the Brocade ICX 7750.

Chapter 2, “Installing the Brocade ICX 7750”

provides the information needed to install the

switch in your network.

Chapter 3, “Brocade ICX 7750 Operation”

discusses the day-to-day operational procedures for

using the switch.

Chapter 4, “Managing the Brocade ICX 7750”

provides procedures for removing and replacing

the field-replaceable units (FRUs), including the fan assemblies and power supplies.

Appendix A, “Brocade ICX 7750 Specifications”

provides tables of physical, environmental, and

general specifications.

Appendix B, “Brocade ICX 7750 Regulatory Statements”

provides a list of the regulatory

statements for safety compliance.

Appendix C, “Brocade ICX 7750 Cautions and Danger Notices”

provides a list of the

international caution and danger statements for safety compliance.