Brocade FCoE Switch Module for IBM BladeCenter Installation and User’s Guide User Manual

Page 32

Advertising
background image

18

Brocade FCoE Switch Module for IBM BladeCenter: Installation and User Guide

FIGURE 7

SFP+ removal

5. Grasp the wire tab on the SFP+ module and pull it out of the port.

6. Replace the protective cap on the SFP+ module and the port.

7. Place the SFP+ module into a static-protective package.

1

Protective cap

3

SFP+ module

2

Wire tab

3

2

1

Advertising