Brocade FCoE Switch Module for IBM BladeCenter Installation and User’s Guide User Manual
Page 32
Advertising
18
Brocade FCoE Switch Module for IBM BladeCenter: Installation and User Guide
FIGURE 7
SFP+ removal
5. Grasp the wire tab on the SFP+ module and pull it out of the port.
6. Replace the protective cap on the SFP+ module and the port.
7. Place the SFP+ module into a static-protective package.
1
Protective cap
3
SFP+ module
2
Wire tab
3
2
1
Advertising