Material required for sewage pump application, Safety instructions, Electrical connection – Burcam 450475 EASYFLUSH TOILET SYSTEM 1/2HP 115V User Manual

Page 2: Notice, Ab c d

Advertising
background image

SAFETY INSTRUCTIONS :

This fi ne pump that you just have purchased is designed from the latest in material and workmanship.
Before installation and operation, we recommend the following procedures :

Check with your local electrical and plumbing codes to ensure you comply with the regulations. These codes
have been designed with your safety in mind. Be sure you comply with them.

We recommend that a separate circuit be lead from the home electrical distribution panel properly protected
with a fuse or a circuit breaker. We also recommend that a ground fault circuit be used. Consult a licensed
electrician for all wiring.

The ground terminal on the three prong plugs should never be removed. They are supplied and designed for
your protection.

Never make adjustments to any electrical appliance or product with the power connected. Do not only unscrew
the fuse or trip the breaker, remove the power plug from the receptacle.

ELECTRICAL CONNECTION :

For pumping systems using more than one pump, each pump needs to be connected to a separate dedicated circuit
protected by a fuse or breaker. This way, the power supply of one pump will not stop operating if the fuse of one of the
pumps burns or if the breaker of one of the pumps trips.

NOTICE :

This unit have been designed to pump water only. This unit is not designed for applications involving salt
water, brine or any other liquids including petroleum products. Use with salt, brine or any other liquids
including petroleum products will void the warranty.

MATERIAL REQUIRED FOR SEWAGE PUMP APPLICATION :

Desired length of PVC/ABS/DWV 2’’ pipe, to link up from pump discharge to waste or drain existing pipe.

Required quantities of 2’’ PVC/ABS/DWV elbow (s) and/or other fi tting (s) to run the discharge line.



1 only 2’’ PVC/ABS/DWV male adaptor to 2’’ slip, to connect the discharge pipe to the pump.

Desired length of PVC/ABS/DWV 3’’ pipe and required quantities of 3’’ PVC/ABS/DWV elbow (s) and/or other

fi tting (s) to run the vent line.

1 only 2’’ union check valve # 450457.

1 only 18’’ X 30’’ minimum size sewage basin like # 400420.

Tefl on tape and PVC/ABS cement.

Waterproof silicone caulking.

TOOLS :

Screwdrivers, hacksaw to cut pipe, knife to assist in pipe cutting, round fi le to smooth pipe ends, pipe wrench,
adjustable wrench, 1/4’’ drill bit and drill. Ensure that you have a gas tight cover for your sewage basin and
3’’ PVC/ABS/DWV vent piping.

A

B

C

D

2

Advertising