Hired-Hand Funnel Flow Fans: Metal Pit Transition Fan Combo Installation (24 Funnel Flow Fan) User Manual

Page 3

Advertising
background image

HIRED-HAND MFG., INC. • 1733 County Road 68 • Bremen, Alabama 35033 · Phone 256-287-1000 • Fax 256-287-2000

Manual Part No. 4802-5251 Rev 7-07

Page 3 of 6

Apply caulk around PTC Flange

and secure the Bottom Transition to the
framing using twenty-two 3/8x1.25 hx SS
Screws (1004-0045) for wood or ¼x1.25
hx SS Screws for concrete (1004-6024).
See Figure 5.

Assemble the Transition Top using #14x½

Screws (1004-9046). First attach the Left and Right Top
Panels to the Top Panel. Then attach the Front Top Panel
to the Left and Right Top Panels while securing the Front
Top Panel under the Top Panel’s flange to complete
assembly of the Transition Top. See Figure 6.

Figure 6 – Assemble the Top

Top Panel

Left Top Panel

Front Top Panel

Right Top Panel

Top Panel’s flange



















































PTC Bottom

2 x 4 Treated Framing

Concrete or Vertical
Opening

STEP 3

Figure 5 – Install the PTC Bottom

STEP 4

3/8x 1.25" SS
Screw or
¼x1.25 hx SS
Screw

Advertising