Assembly instructions – Rhino Shelter HOUSE-14W X 42L X 15H User Manual

Page 4

Advertising
background image

Assembly Instructions

RV Style 14 x 42 x 15


V 2.2

Please Do NOT Return Assembly To Dealer or Store. For All Questions and assistance, contact MDM Products directly.

Customer Service 203-877-7070 or 800=447-7079

4

SITE PREPARATION

Select a level or as close to level as practical location
for your Rhino Shelter Building. The building should
be placed on a base of materials suitable for the
storage load to be protected. The unit should not be
located under trees, which will shed hard fruit such as
apples, walnuts, or heavy pinecones. The cover of
your unit will protect against normal falling leaves and
light debris, however large branches or other falling
items may cause a puncture or tear in the cover
material. Take notice of drainage around your
intended location. Water draining from the
surrounding terrain should be considered so that it
does not run into the unit. As well, rain or melting
snow hat comes off the unit should be drained away
rather than accumulate and pool around the unit.
Check to be certain that adequate clearance is
allowed for entry and exit from ends of the unit. As
unit has doors on both ends, ideally RV, boat, or
equipment can be inserted or removed from either
end.

Using the stakes and string, measure off and
square area for intended installation. Level the
ground as best as possible. A properly leveled
frame yields maximum strength.

FRAME ASSEMBLY

Step 1. Assemble the Front & Rear End Arch
Assemblies and two intermediate arches with feet
(4 arches total)

Each Arch Assembly consists of:

3 - #1 CT-8006 Crest Tube/Side Bend

2 - #2 RP-8007 Rafter Pole - swedged
2 - #3 UP-8008 Upper leg pole
2 - #4 EUL-8002 Lower leg pole with foot




Use 4” Carriage bolts #CBN-7005-4with curved
washers #CBN-7005-CW and locknuts #CBN-7005-
N through pre-drilled holes in frame members. Be
certain to insert carriage bolts from the outside into
the interior of the unit, with the washers and nuts on
the inside of the frame. This will prevent the bolts
from puncturing through the cover material. Do not
tighten down the nuts completely until frame is fully
assembled and set in place.

Step 2.
Attach Corner Wind Braces #6 CW-8005 to
the INSIDE of EACH side of the End Arch assemblies
you assembled in Step 1 with 4” carriage bolts CBN-
7005-4, flat washer #CBN-7005-W, and nuts #CBN-
7005-N. Do not tighten completely.

Step 3. Assemble the rmaining two arches.

Each Interior ARCH ASSEMBLY consists of:
3 - #1 CT-8006 Crest Tube/Side Bend
2 - #2 RP-8007 Rafter Pole - swedged
2 - #3 UP-8008 Upper leg pole
2 - #5 EUL-8003 Lower leg pole no
foot

Use Carriage Bolts with Washers and Nuts through
pre-drilled holes in frame members. Be certain to
insert carriage bolts from the outside into the interior
of the unit, with the washers and nuts on the inside
of the frame. Do not tighten down the nuts
completely.

Advertising