Airvantage servicing - power generation module – SANDPIPER RHDF2 Hazardous Duty User Manual

Page 27

Advertising
background image

rhdf2dl1sm_haz duty-rev0614

Model RHDF2 Hazardous Duty Page 25

Note: Refer to Composite Repair Parts List on

page 12 for part numbers

AirVantage Servicing -

Power Generation Module

To service the power generation module, first shut off and bleed the air being supplied to the

pump. For safety purposes the air supply line should be disconnected from the pump. Then shut off the

suction and discharge lines to the pump. Bleed the pressure from the pump suction and discharge lines

and remove the lines from the pump. During the servicing of the AirVantage, consult the “AirVantage

Composite Repair Parts Drawing”.

Step #1: Remove the Patch Cable

• Twist the ribbed portion of the patch cable connector in a counterclockwise direction, until it unthreads

from the connector. The cable can be removed only from the intermediate.

Step #2: Remove the AirVantage from the Pump

• Use a ½” socket and remove the four 5/16-18 x 5 ½ cap screws that hold the AirVantage to the

pump. Be sure to support the weight of the AirVantage while removing the last cap screw. After the

AirVantage is removed from the pump, set the unit down on the plastic cover located on the top of the

unit. Inspect the o-ring between the poppet valve and the adapter plate for damage.

Step #3: Access the Power Generation Module

• Use a 4mm hex-key wrench and loosen the four M5 x 16mm socket head cap screws

• securing the bottom cover. Lift the bottom cover off, exposing the power generation module. There is

a molded o-ring seal located on the underside of the cap. Make sure the o-ring stays located within

the groove.

• If the power generation module needs to be replaced, unplug the connector that connects

• the power generator to the control board. Use a 4mm hex-key wrench to loosen the four M5 x 25mm

socket head cap screws. The power generation module should now be loose. Carefully lift the power

generation module off the rest of the assembly, making sure that the control board wire and connector

slips through the hole in the power generation case.

• "AirVantage CAUTION" - Take caution not to loosen the o-ring that seals between the

components.

Step #4: Reinstallation

• When reinstalling the new module make sure to feed the control module wire through the hole in the

power generation case. Install the four M5 x 25mm socket head cap screws and tighten to 6.8 N-M.

• “AirVantage CAUTION” – Be sure to reattach the connector from the power generator to the

control board.

• Reinstall the bottom cover, making sure the o-ring seal is still in the groove. Tighten

• the four M5 x 16mm socket head cap screws to 3.4 N-M.

• Reinstall the top cover, making sure the o-ring seal is still in the groove. Tighten the

• four M5 screws. Reinstall the AirVantage using the four 5/16-18 x 5 ½ cap screws and torque to 90

in-lbs.

• “AirVantage CAUTION” – Be sure to reattach the patch cable connector that connects the

AirVantage module to the intermediate.

CAPSCREW, HEX SOC HD,

M5 x 0.8 x 16

COVER

SEAL, O-RING

CAPSCREW, HEX SOC HD,

M5 x 0.8 x 25

POWER GENERATION MODULE

CONNECTOR

(To Intermediate)

CONTROL MODULE

VALVE, POPPET

SEAL, O-RING

CONNECTOR (Power

Generation Module to

Control Module)

Connector (Control Module

to Power Generation Module)

Breather Assembly

SEAL, O-RING

Advertising