Using ellipsoid heights – Spectra Precision Survey Pro v3.80 Ranger GPS User Manual User Manual

Page 33

Advertising
background image

RTK Data Collection

29

3.

If your benchmark is a point in the job file, use the

button to

select the point, or enter the point number in the

Select Point

field.

4.

Occupy the benchmark with the rover and tap

2FFXS\ %HQFKPDUN to access the Occupy Control Point screen and

begin measurements to the point.

5.

When you are satisfied with the measurement, tap

$FFHSW. You

will return to the Remote Elevation screen and the base station’s
calculated new elevation is displayed. The occupied benchmark
point has now been added to the job file.

6.

If the new base elevation is acceptable, tap

$FFHSW from the

Remote Elevation screen to update the projection. This will add a
vertical site calculated from the single benchmark and update the
base elevation in the job file.

Using Ellipsoid Heights

Ellipsoid height is a method that stores the local ellipsoid height
measurement as the vertical coordinate. Use ellipsoid heights if the
vertical is not important to the project, or when you intend to
transform heights to elevations in the office using a separate
program.

1.

Set the

Vertical Projection Mode

on the Job, Settings, Projection

card to

Ellipsoid Height.

2.

Tap

2.. Using vertical ellipsoid heights requires no additional

projection solution.

Advertising