KYORITSU 4140 User Manual

Page 19

Advertising
background image

̶ 17 ̶

      Fig.7-5

7.3. Operating instructions for LOOP and PSC/PFC
7.3.1 Initial Checks: to be carried out before any testing
1. Preparation
Always inspect your test instrument and lead accessories for

abnormality or damage: If abnormal conditions exist DO NOT

PROCEED WITHTESTING. Have the instrument checked by

your distributor.

(1)OperatethePowerswitchandturnontheinstrument.(Pressthe

Powerswitchforatleast1sec.)

Pressanyofthefollowingswitchestoselectafunction.

・ L-PEATTON:forLine–Earthloopimpedancetests(withATTon)

・L-PEATTOFF:forLine–Earthloopimpedancetests

・L-N/L-L:forline-neutralorline–lineloopimpedancetests

●ATT enables a measurement without tripping the RCDs with the

rated residual current of 30mA or more.

(2)InserttheTestLeadintotheinstrument.(Fig.7-6)

Fig.7-6

2. Wiring Check

Aftertheconnection,ensurethatthesymbolsforWiringcheckon

theLCDareinthestatusindicatedinFig.7-6beforepressingthe

test switch.

If the status of the symbols for Wiring check differ from Fig.7-6

Advertising