INSTALLATION

Pre-Plan your installation. You will need to accomplish the following:

Meet all National and Local codes. (NEC

®

Article 285 addresses SPDs)

Mount SPD as close to panel or equipment as possible to keep leads short.

Ensure leads are as short and straight as possible, including neutral and ground.

Consider a breaker position that is closest to the SPD and the panel’s neutral & ground.

Suggested breaker & conductor size is 60A-30A with 6 AWG.

Make sure system is grounded per NEC

®

and clear of faults before energizing SPD.

The following options or implementations require extra consideration. See appropriate sections

within this manual:

Internal or Integral Mount Installation inside electrical gear (page 5)

Flush Mount Option (page 6)

Retro-fit where no breaker positions are available (page 6)

UL/NEMA 3R Drain Holes (page 6)

1. Use a voltmeter to check all voltages to ensure correct SPD.

2. If SPD has Dry Contact, Remote Monitoring or Remote Display, pre-plan their installation.

3. Remove power for panel. Confirm panel is deenergized.

4. Identify connection/breaker location and SPD location.

5. Make sure leads are short! Reducing inches matter! Pretend that connector leads cost you

$1000/foot to make leads short!

6. Remove an appropriately sized knockout from panel. Create an appropriately sized hole in the

SPD enclosure.

7. Mount SPD.

8. Connect conductors as appropriate – short and straight as possible

(Note that Hi-Legs are Phase B).

9. Label or mark conductors as appropriate (neutral: white, ground: green, energized:

black, hi-leg: orange).

10. Make sure system is bonded per NEC

®

and is clear of hazards or faults before energizing.

(N-G bonding not per NEC

®

will fail SPDs: #1 cause of SPD failures.)

11. Energize and confirm proper operation of indicators and/or options.

Figure 7

TYPICAL PANEL INSTALLATION

A

B

C

G

N

BREAKER

Phase C

Service

Phase B

Phase A

Surge Counter

Advanced Protection Technologies

Silence

Test

Count

Reset

Use closest breaker to SPD

Locate SPD close to intended breaker

Keep Leads Short as Possible

Avoid Sharp Bends

Outdoor installation requires appropriate

weather sealing at nipple (o-ring, sealing

conduit, etc.)

To Protected Loads