Prochem Peak GTX User Manual

Page 34

Advertising
background image

32

Operations

Winterizing Your Unit

1. Shut off the water supply. Disconnect the water

inlet hose from the front of your console.

2. Connect all solution pressure hoses and tools that

may have water in them.

3. Start the unit and turn solution pump on. Open the

tool valve until water pressure drops and water
stops flowing.

4. Turn off the solution pump. Fill the water box with

approximately two gallons of 100% glycol base
anti-freeze.

5. Turn the solution pump switch ON.

6. Open the tool valve until anti-freeze begins to

come out of the tool. Recover ALL anti-freeze that
comes out of the tools into an approved container.
We strongly recommend that you re-cycle and re-
use the anti-freeze.

Repeat this procedure with all the remaining tools. After
all tools and pressure hoses have been filled with anti-
freeze, disconnect and store them.

7. Turn the solution pump switch OFF. Attach the

winterizing loop hose with attachment, Part
#86260700, to the bottom solution outlet connec-
tion and the water inlet connection. Turn the
solution pump switch ON.

Allow the unit to run for approximately 3 minutes with
the winterizing loop hose attached.

8. Prime the chemical system with 50/50 anti-freeze/

water mix. Insert the chemical inlet and prime
discharge tubes into the anti-freeze container.
Turn the chemical valve to PRIME until anti-freeze
begins to flow out of the prime hose.

9. Now turn the chemical valve and flow simulator

valves to the open position, making certain that the
flow meter indicates flow and that all anti-freeze
drains out of the chemical hose into an approved
container, after 30 seconds, turn off both valves.

10. After completing these procedures, shut the unit

down. The unit is now winterized.

86325860 PEAK GTX PROCHEM

Advertising