Prochem Peak GTX User Manual

Page 6

Advertising
background image

4

86325860 PEAK GTX PROCHEM

Receiving Your Unit

Acceptance of Shipment

Every part of your cleaning unit was carefully checked,
tested, and inspected before it left our manufacturing
plant. Upon receiving the unit, make the following
acceptance check:

1. The unit should not show any outward signs of

damage. If damaged, notify the common carrier
immediately.

2. Check your equipment and packing list. The stan-

dard cleaning unit should arrive equipped with the
following items (unless otherwise specified) and
any optional accessories which were ordered:

Equipment List

1. Console.

2. Waste tank

3. Fuel pump assembly

4. 100 ft. of 2" vacuum hose.

5. 1 vacuum hose connector.

6. 100 ft. of 1/4" solution pressure hose with quick

connects.

7. 50 ft. water supply hose with quick connect.

8. Installation bolting kit.

9. Installation mounting plates.

10. Operation and service manual for engine, water

pump, and vacuum pump.

11. Hose clamps for vacuum hoses.

Advertising