2 master-master parallel circuit operation – Timeguard 201.0.090 User Manual

Page 12

Advertising
background image

2

.2 Master-Master parallel circuit operation

Multiple masters control multiple lighting groups

One master with individual brightness measurement per lighting group.

Presence detection is done by all detectors together.

Potentiometer and DIP switches are set on each master individually.

Max. 10 detectors can be connected in parallel.

Use the same phase for all detectors.

The switching contact «Presence» can be tapped on any master.

Mark the power modules as master or slave respectively.







N

L

N

L

S A

P

B2

B1

compact

power

Master 1

N

L

S A

P

B2

B1

compact

power

Master 2

Master

Lux

Master

Lux

DIP

Master
Slave

Master
Slave

DIP

Presence (e.g. HVAC)

Advertising