Installation, Before you begin, Packing list – Avalon Stoves Indoor Fireplace User Manual

Page 7: Installation options, Planning the installation, Minimum fireplace size

Advertising
background image

Installation

7

Travis Industries

4 0 5 0 5 2 5

1 0 0 - 0 1 1 4 4

Before You Begin

READ THIS ENTIRE MANUAL BEFORE YOU INSTALL AND USE THIS HEATER.
FAILURE TO FOLLOW THE INSTRUCTIONS MAY RESULT IN PROPERTY DAMAGE,
BODILY INJURY, OR EVEN DEATH.

Check with local building officials for any permits required for installation of this pellet heater and notify
your insurance company before proceeding with installation.

Packing List

• Thermostat & Wire • Scraper Rod Tool • Fuses (2) • Fireplace Installation Sticker • Brush

• Leveling Bolts (2) • Control Board Screws • Hopper Screws • Double-Back Tape (for panels)

Installation Options:

Masonry Fireplace Factory Built (Metal) Fireplace • Outside Air Compatible

Planning The Installation

• Have an authorized Travis Industries dealer install this heater. If you install the heater yourself, have

your dealer review your installation plans.

• Place the heater outside and load 10 pounds of pellets inside the hopper. Plug the heater in and

let it run on HIGH until the pellets run out. This will cure the paint and burn off any oil on the steel,
eliminating any smell inside the home.

• Inspect the chimney and clean as necessary before installing the heater. NOTE: The convection

blower is open to the fireplace cavity and may circulate odors from the fireplace. You may wish to
paint the interior of the fireplace with latex paint to prevent odors from entering the home.

Minimum Fireplace Size

Min. 36"

(6" from door

opening)

Min. 36"
(includes circuit board)

Mantel
(combustible or non-combustible)

Non-Combustible

Facing

Min. 32-3/4"

(6-1/4" from

hopper lid)

Min. 18"

Non-Combustible Hearth

Min. 14"

Min.42"

(7" from hopper

lid)

See "Mantel

Requirements" for

details

25-3/4” - 20” See
“Hopper Extension
Set-up”

Advertising