Site planning, Installing the storage router, Site planning installing the storage router – HP StorageWorks IP Storage Router User Manual

Page 28

Advertising
background image

Installation

28

IP Storage Router SR2122-2 User Guide

Site Planning

Planning the proper location and layout of your SR2122-2, your equipment rack,
or wiring closet is essential for successful storage router operation. Equipment
placed too close together or in a poorly ventilated area can cause the system to
overheat. In addition, poor equipment placement can make system panels
inaccessible and difficult to maintain.

Table 20

in Appendix A lists the operating and nonoperating environmental site

requirements for the SR2122-2. Within specified environmental ranges, the
system can continue to operate; however, a measurement that approaches the
minimum or maximum of a range indicates a potential problem. You can maintain
normal operation by anticipating and correcting environmental conditions before
they exceed the maximum operating range.

Verify the site power for the type of device you are installing. Power requirements
are useful for planning the power distribution system needed to support the
storage router. Heat dissipation is an important consideration for sizing the
air-conditioning requirements for an installation. See

Table 20

in Appendix A for

power and heat ratings for the SR2122-2.

Caution:

To prevent a loss of input power, verify that the total maximum load

on the circuit supplying power to the power supply is within the current ratings

of the wiring and breakers.

Installing the Storage Router

You can install the SR2122-2 on a table or a shelf, or in an equipment rack. The
following sections describe the steps required to install the storage router:

Installing on a Table or a Shelf

Rack-Mounting the Storage Router

Installing SFP Modules

Advertising
This manual is related to the following products: