Redundant hot-plug power supply option (with cage) – HP ProLiant DL120 G7 Server User Manual

Page 40

Advertising
background image

Hardware options installation 40

8.

Install the battery pack.

9.

Route the cable ("

BBWC battery cabling

" on page

50

).

10.

Install the PCIe riser cage (on page

19

).

11.

Install the access panel (on page

18

).

12.

Install the server into the rack ("

Installing the server into the rack

" on page

25

).

13.

Power up the server ("

Powering up and configuring the server

" on page

26

, on page

17

).

Redundant hot-plug power supply option (with cage)

To install the component:

1.

Power down the server (on page

17

).

2.

Remove all power:

a.

Disconnect each power cord from the power source.

b.

Disconnect each power cord from the server.

3.

Remove the server from the rack (on page

17

).

4.

Remove the access panel (on page

18

).

5.

Remove the air baffle (on page

19

).

6.

Remove the PCIe riser cage (on page

18

).

7.

Disconnect any power cables connected to the front drive cage.

8.

Remove all cables connected to the system board.

9.

Remove the system board.