Connect state diagram, Figure 6, Northbridge connect state diagram – AMD ATHLON 8 User Manual

Page 28

Advertising
background image

16

Power Management

Chapter 4

AMD Athlon™ XP Processor Model 8 Data Sheet

25175H—March 2003

Preliminary Information

Connect State
Diagram

Figure 6 below and Figure 7 on page 17 show the Northbridge
and processor connect state diagrams, respectively.

Figure 6. Northbridge Connect State Diagram

Condition

1 A disconnect is requested and probes are still pending.

2 A disconnect is requested and no probes are pending.

3 A Connect special cycle from the processor.

4 No probes are pending.

5 PROCRDY is deasserted.

6 A probe needs service.

7 PROCRDY is asserted.

8

Three SYSCLK periods after CLKFWDRST is deasserted.

Although reconnected to the system interface, the
Northbridge must not issue any non-NOP SysDC
commands for a minimum of four SYSCLK periods after
deasserting CLKFWDRST.

Action

A

Deassert CONNECT eight SYSCLK periods
after last SysDC sent.

B Assert CLKFWDRST.

C Assert CONNECT.

D Deassert CLKFWDRST.

Disconnect

Pending

Connect

Disconnect

Requested

Reconnect

Pending

Probe

Pending 2

Disconnect

Probe

Pending 1

1

3

2/A

4/A

5/B

3/C

7/D,C

8

6/C

7/D

8

Advertising