Completing the configuration – HP ProLiant BL495c G5 Server-Blade User Manual

Page 18

Advertising
background image

3.

Prepare the server blade for installation.

4.

Install the server blade.

Completing the configuration

To complete the server blade and HP BladeSystem configuration, see the overview card that ships with the
enclosure.

Setup 18

Advertising