Caution, Prudence, Installation instructions – GE ZV900SLSS User Manual

Page 12: Warning, Avertissement

Advertising
background image

7 CONNECT DUCTWORK

• Install ductwork, making connections in the

direction of airflow as illustrated.

• Push duct over the exhaust outlet and damper.
• Secure joints in ductwork with sheetmetal screws.
• Wrap all duct joints and the flange connections

with duct tape for an airtight seal.

CAUTION:

Do not use sheet metal screws

at the hood flange connection. Doing so will prevent

proper damper operation. Seal connection with

tape only.

PRUDENCE :

Il ne faut pas utiliser de vis autoraurdeuses à la

connexion du collet de la hotte. Ceci empêcherait

le bon fonctionnement du registre. N’utiliser que du

ruban adhésif pour assurer l’étanchéité du raccord.

Installation Instructions

Duct tape

over seam

and screw

Screw

Airflow

,167$//$7,21³9(17('727+(2876,'(

12

 MOUNT THE HOOD

WARNING:

2 people are required to lift and

position the hood onto the mounting bracket.

AVERTISSEMENT :

If faut deux personnes pour lever et mettre en place

la hotte sur le support de montage.
• Lift the hood onto the mounting bracket.
• Position a spirit level at the bottom of the hood to

check side to side leveling.

6 LEVEL THE HOOD

This hood has built-in levelers on the mounting hooks

at each side. Use a long Phillips screwdriver from the

front to access the levelers.

• Use the top screw hole in the leveler to raise or lower

the hood on that side.

• Use the bottom screw hole to pull the hood tight

against the wall surface.

• Mark hole location at the bottom of the hood.
• Remove the hood. If the bottom screw hole does not

enter a stud, enlarge the hole to 3/8d and install wall

fastener anchors.

• Place the hood back onto the mounting bracket,

check level again and install the wall fastener.

Screw hole

Levelers

Advertising