Installation instructions, Important, Install framing for hood support – GE ZV900SLSS User Manual

Page 9: Ductwork, wiring locations

Advertising
background image

9

 INSTALL FRAMING FOR HOOD

SUPPORT

IMPORTANT

Framing must be capable of

supporting 100 lbs.

If drywall is present, mark the screw hole locations for

the top mounting brackets. Remove the template.
• Cut away enough drywall to expose 2 vertical studs

at the bracket location indicated on the template.

• Install a horizontal support at least 1" x 6" between

two wall studs at the bottom mounting bracket

installation location. The horizontal support must

be flush with the room side of the studs. Use cleats

behind both sides of the support to secure to wall

studs.

• Reinstall drywall.

Installation Instructions

DUCTWORK, WIRING LOCATIONS

Determine the exact location of the vent hood.

• Locate the template packed with the literature.

– Measure 36" from the floor to the top of the cooking

surface. Add hood installation height determined on

page 7. Mark that location.

– Use a level to draw a straight pencil line on the wall.

– Tape the template in position along the penciled

line. CHECK TO BE SURE THE TEMPLATE IS LEVEL.

Ceiling ducting:
If ductwork will vent straight up to the ceiling:

• Use a level to draw a line straight up, from the

centerline on the template to the ceiling.

• Measure 5-1/2" from the back wall to the centerline

of an 8-1/2" hole on the ceiling.

NOTE: If drywall is not present, add drywall thickness

to the 5-1/2" dimension.

Wall Ducting:
If ductwork will vent to the rear:

• Use a level to draw a line straight up from the

centerline on the template.

• Measure at least 26" above the pencil line that

indicates the bottom installation height, to the

centerline of an 8-1/2" dia. duct hole. (Hole may be

elongated for duct elbow.)

HOUSE WIRING LOCATION:

• The junction box is located on the top left side of the

hood.

• Wiring should enter the back wall at least 22" above

the bottom of the hood, and within 6" of the left side

of the centerline.

5-1/2” c enterline to wall

8-1/2” dia. hole

FOR CEILING VENT DUCTING

Centerline 26” above

the marked bottom

pencil line for

installation height.

FOR WALL VENT DUCT

,167$//$7,21³9(17('727+(2876,'(

Ceiling

Centerline of

installation

space

View from rear

cleats

1” x 6” min.

mounting

support

8-1/2” min. opening for ductwork

Advertising