Ridetech 11370199 User Manual

Page 10

Advertising
background image



11. Align upper bar frame bracket with
the rivets in the leaf spring hanger. Drill
one hole and fasten with 1/2” x 1-1/2”
bolts, washers, and nylocs. Then drill
remaining holes and tighten all bolts.

12. Watch for brake lines, fuel lines,
and wiring harness.

13. Clamp the lower bridge to the axle
using the upper frame brackets and 5/8”
x 6 1/2” bolts supplied. It will be clocked
with the leaf spring alignment pin hole
and the Allen head bolt in the upper axle
bracket.

14. Attach the lower bar (the longer one)
to the bridge and frame bracket. Use
5/8” x 2 3/4” bolt supplied for upper bar
and factory bolt for lower bar.

15. The upper bar will attach to the
upper axle bracket and to the frame
bracket. It will use 5/8” x 2 3/4” bolts
on both ends.

Advertising