Ridetech 41240000 User Manual

Page 2

Advertising
background image

TGR14000 Installation Instructions

• Initial fitment of the floor mount brackets must be done under the carpet. Final installation can

be done under or over the carpet.

• Use Anti-Seize on all fasteners that are threaded into stainless clamps or brackets.
• Install all bars before final tightening.
• Always tighten the tab side of the clamp first.
• Torque all 3/8” fasteners to 45 ft-lbs and all 1/2” fasteners to 75 ft-lbs.
• Make sure the clamp is exactly where you want it before tightening as the clamp may scratch

the tubing.

Watch for fuel and brake lines when drilling holes through the floor pan.






1. Start by replacing all of the body
mounts with the new polyurethane
mounts included. Using the old
rubber mounts can cause clearance
and fitment issues.

2. Position the main hoop floor
mount so that the front of it is 38 5/8”
behind the pinch weld at the front of
the door opening.

3. Using the bracket as a template;
drill six 3/8” holes through the floor
pan. Drop 3/8” x 1 ¼” bolt w/ flat
washers down through floor pan.

4. Bolt the frame brackets to the
bottom of the floor pan using 3/8”
Nylok nuts and flat washers. These
two brackets attach to the inside of
the frame rail.

5. The frame should be drilled with a
3/8” bit for the rear bracket. Use
3/8” x 1 ¼” Nylok nut and flat
washers to secure the bracket to the
frame.

6. The holes for the front bracket
need to be drilled with a 5/16”. A
3/8” x 1” self-tapping screw is used
on this bracket since the frame is
boxed in this section.

Advertising