Tuff Country 24975 - Ford 08-14 F250/F350 5 box kit User Manual

Page 12

Advertising
background image

Congratulations, installation complete!

Special note: After the completion of the installation,

Tuff Country EZ-Ride Suspension recommends taking

the vehicle to an alignment shop and having a proper

front end alignment performed.

Tuff Country EZ-Ride Suspension recommends that a

complete re-torque is done on all bolts associated with

this suspension system. It is the customers responsi-

bility to make sure that a re-torque is performed on all

hardware associated with this suspension system after

the first 100 miles of installation. It is also the custom-

ers responsibility to do a complete re-torque after every

3000 miles or after every off road use. Neglect of follow-

ing these steps could cause brackets to come loose and

cause serious damage to the suspension system and to

the vehicle.

Advertising