InfraStruXure Site Planning, Installation, Start-Up

29

Start-Up Procedure

Safety warnings

Ensure that all power is off

Only APC Field Service Engineers or qualified, APC-trained personnel may
perform a system start-up.

Before you proceed, ensure that power is off by following the procedure in this

section.

1. Open (turn OFF) the PDU main input.

2. Set the upstream input circuit breaker (utility or

UPS) to the OFF or Locked Out position.