Installation, commissioning of parallel grippers, Jaw parallel grippers, Caution – ROHM RPP / RPP-A 2-jaw parallel gripper User Manual

Page 25: Installation of gripper rpp

Advertising
background image


Installation, Commissioning of Parallel Grippers

2-jaw parallel grippers

ID 1104573 Operating Manual RPP; RPP-A
Röhm GmbH, Dillingen Works Röhmstr. 6, 89407 Dillingen/Donau, GERMANY, Tel. (49)9071/508-0

Page 25 of 37

RPP

Caution:

The energy supply must be switched off during installation of the gripper. Observe

also the safety precautions. Please refer to the catalogue for the connection dimensions of the
respective gripper size.

Installation of Gripper RPP

1. Position the gripper using the centering sleeves contained in the accessories kit.

2. Bolt on the gripper from above using 4 mounting bolts supplied. If the gripper is mounted on

the side, the customer must provide mounting bolts.

Please observe the specified tightening torques.

3. With hoseless direct connection, pay attention to a clean connection surface. Use the

corresponding gaskets from the accessories kit.

4. During installation with compressed air screw fitting, pay attention to leak tightness of the

fitting.

Caution! When using hoseless direct connections, remove the grub screws and close off
the ports not used using suitable blind plugs.

5. Installation and adjustment of the polling sensors.

See "Installation of the proximity sensors and magnetic switches"

Function check

1. Actuate the gripper and test the stroke end positions of the jaws.

2. Check the sensor signal.

3. Check this function also with the workpiece.

XXX

Anschraubflächen

Anschraubflächen

Für schlauchlosen

Direktanschluss von unten

M5; G1/8"; G1/4 - Gewinde für

Pneumatikanschluss

Zentrierhülse;

Gewindebohrung bzw.

Durchgangsbohrung für Anbau des

Greifers von unten.

Zentrierhülse;

Gewindebohrung bzw.

Durchgangsbohrung für

seitlichen Anbau des

Greifers.

Sperrluftanschluss

Advertising